@goatsarah @cy
The "bug" in this case is a major conceptual flaw in the design, which basically was to create a stupid-simple CENTRALIZED blocklist aggregation tool that had no facility for documentation, review, appeal, auditing, moderation, etc. Basically "minimum viable product" [MVP] applied to a case where applying MVP methodology was guaranteed to cause harm.
Embed Notice
HTML Code
Corresponding Notice
- Embed this notice
FeralRobots (feralrobots@mastodon.social)'s status on Tuesday, 12-Sep-2023 19:44:20 JST FeralRobots