@JetlagJen @irina @davidtheeviloverlord My problem is I have to turnaround a novel's worth of tracked changes (an order of magnitude more than 200!) and I don't have enough time to re-do the job if the tool I'm using chokes 90% of the way through the job. And as it's on the critical path of the production schedule I then get paid six months late.