@goatsarah @ajlanes I can’t help feeling that the Morocco-UK link would be easier and quicker to do by transmitting through the Spanish and French land-based grids. After all, the east coast side of England’s grid (with most of the interconnectors) has become, at times, a fancy way of selling electricity between non-adjacent European countries.