So the NASA contract for the Spaceship lunar lander requires SpaceX Starship launches SIXTEEN times within a month and a half to put the propellant needed into orbit (and the propellant boils off if it’s done slower).
This means a launch every 3 days (or 6 days with two launch sites).
And the mission is planned for end of 2026.
Lol, yeah, nope.