On Tuesday, we had about 80-90 mm of new snowfall between 7am -> 3am. Part of this precipitation was rainfall. During that time, every part of our 168 km priority 🚶♀️🚲 network was plowed a minimum of 6 times, and a maximum of over 20 times, depending on the path section and width. 1/3