GNU social JP
  • FAQ
  • Login
GNU social JPは日本のGNU socialサーバーです。
Usage/ToS/admin/test/Pleroma FE
  • Public

    • Public
    • Network
    • Groups
    • Featured
    • Popular
    • People

Embed Notice

HTML Code

Corresponding Notice

  1. Embed this notice
    Steve's Place (steter@mastodon.stevesworld.co)'s status on Friday, 01-May-2026 13:42:43 JSTSteve's PlaceSteve's Place

    PBOT seems to be telling us that they'd like more money to do something beyond a "short-term fix" for a failing roadway.

    (April 30, 2026) The Portland Bureau of Transportation (PBOT) will pave seven critical blocks of NW 23rd Avenue from NW Northrup to Vaughn streets starting on Monday, May 4 with work starting at 6 a.m. and continuing through 4:30 p.m. Monday to Thursday.

    During the week of May 4 through 7, resurfacing of NW 23rd Avenue will occur between NW Vaughn and Quimby streets. From May 11 through 14, resurfacing will occur between NW Quimby to Northrup streets.

    In 2010, PBOT paved NW 23rd Avenue from West Burnside to Lovejoy Street as part of a Capital Improvement Project. At that time the bureau rebuilt corner ramps and removed historic streetcar rails which were the cause of significant pavement deficiencies.

    This current paving project is a short-term fix to address critical pavement failures on NW 23rd Avenue. The street’s base (the support structure under the driving surface) has failed, causing extensive surface cracking, potholes, and water infiltration that extends below the surface of the roadway. The conditions are leading to unsafe conditions for people traveling along and across the corridor.

    The resurfacing will support NW 23rd Avenue's main street activity, including businesses and emergency room access at Legacy Good Samaritan Medical Center. It will improve conditions on the Neighborhood Main Street until the Montgomery Park Streetcar Extension can address the street's structural issues and broader streetscape needs.

    Throughout construction, all businesses and sidewalks will remain open, as will pedestrian access throughout the corridor. Both lanes and parking will reopen at the end of each workday at approximately 4:30 p.m., and both lanes and parking will be open on Friday and over the weekend.

    #Portland #PBOT #PDX #transportation

    In conversationabout 4 months ago from mastodon.stevesworld.copermalink

    Attachments

    1. No result found on File_thumbnail lookup.
      streets.in
      This domain may be for sale!
  • Help
  • About
  • FAQ
  • TOS
  • Privacy
  • Source
  • Version
  • Contact

GNU social JP is a social network, courtesy of GNU social JP管理人. It runs on GNU social, version 2.0.2-dev, available under the GNU Affero General Public License.

Creative Commons Attribution 3.0 All GNU social JP content and data are available under the Creative Commons Attribution 3.0 license.