GNU social JP
  • FAQ
  • Login
GNU social JPは日本のGNU socialサーバーです。
Usage/ToS/admin/test/Pleroma FE
  • Public

    • Public
    • Network
    • Groups
    • Featured
    • Popular
    • People

Conversation

Notices

  1. Embed this notice
    Steve's Place (steter@mastodon.stevesworld.co)'s status on Wednesday, 27-May-2026 07:27:59 JST Steve's Place Steve's Place

    The insurance company told the HOA that it wanted corner concrete work done. ADA ramps are required here. Now, a couple of years ago, when the city resurfaced the street, crews installed one, but not at this particular corner. Anyway, the HOA paid to have it installed.

    I have no idea why I wrote that paragraph. Here's today's missive from PBOT:

    (May 26, 2026) Crews with the Portland Bureau of Transportation (PBOT) will improve ADA ramps on NW 23rd Avenue at NW Marshall and at NW Lovejoy streets starting on Wednesday, May 27 through the end of August.

    The work will require closures of travel lanes and sidewalks in the area, for several days to several weeks at a time. Work will support NW 23rd Avenue's main street pedestrian activity, including businesses and emergency room access at Legacy Good Samaritan Medical Center.

    From May 27 through late August, PBOT sidewalk crews will generally update one corner at a time, to limit the impact on traveling public in this business district that has high population density and pedestrian traffic. For each phase of construction, there will be different closures of travel lanes, sidewalks or parking lanes, so check the Travel Impact Biweekly Updates on the project website for specific details through the summer and plan to observe barricades, traffic signage and instructions from crews at the scene.

    Lane and sidewalk closures will be in place all hours, all days, during periods when crews have to dig below the sidewalk and street surface. Some adjustments to stormwater infrastructure will require digging trenches several feet deep. Crews are expected to be present generally 6:30 a.m. through 3:30 p.m. Monday to Thursday and 6 a.m. to 1:30 p.m. every other Friday.

    PBOT paving crews are expecting to return this fall to repave the impacted areas on these two blocks on NW 23rd, after the ramp upgrades have been completed.

    #Portland #Oregon #PBOT #transportation

    In conversation about 3 months ago from mastodon.stevesworld.co permalink

    Feeds

    • Activity Streams
    • RSS 2.0
    • Atom
    • Help
    • About
    • FAQ
    • TOS
    • Privacy
    • Source
    • Version
    • Contact

    GNU social JP is a social network, courtesy of GNU social JP管理人. It runs on GNU social, version 2.0.2-dev, available under the GNU Affero General Public License.

    Creative Commons Attribution 3.0 All GNU social JP content and data are available under the Creative Commons Attribution 3.0 license.