One half of the new shelter is in place. Green roofed and frame painted blue the window frames are bare reclaimed wood. The guttering and downpipe are connected to a black water butt with four other water butts still needing to be connected up. The shelter has an end window with a recycled white upvc windowsill and a window fitted on the front facing wall. In time another window will be fitted next to it. This photo was taken before the rickety shed next to it was taken down to make room for constructing the second half of the shelter.
https://media.universeodon.com/media_attachments/files/111/107/169/356/063/400/original/156e2ffc18545729.jpeg